Welcome from the Executive Director Commission LA Waterfront Stay Connected with the Port on Facebook Twitter and eAlerts
Follow the Port on Facebook Follow the Port on TwittereAlertsLAtitude
 

Draft EIR - Southern California International Gateway (SCIG) Project

The Environmental Management Division of the Los Angeles Harbor Department has prepared a Draft Environmental Impact Report (DEIR) for the following project in the Port of Los Angeles:

Southern California International Gateway (SCIG) Project

AVAILABILITY: A copy of the document is available for review here on the Port of Los Angeles website (see table below) and at each of the following locations:

  • Port of Los Angeles Administration Building, 425 S. Palos Verdes Street, San Pedro, CA 90731
  • Los Angeles City Library, San Pedro Branch, 931 S. Gaffey Street, San Pedro, CA 90731
  • Los Angeles City Library, Wilmington Branch, 1300 N. Avalon, Wilmington, CA 90744
  • Carson Regional Library, 151 E. Carson Street, Carson, CA 90745
  • Martin Luther King Library, 17906 S. Avalon Blvd., Carson, CA 90746
  • Los Angeles Public Library, Central Branch, 630 W. 5th Street, Los Angeles, CA 90071
  • Long Beach Main Library, 101 Pacific Ave., Long Beach, CA 90822
  • Bret Harte Neighborhood Library, 1595 Willow St., Long Beach, CA 90810


PUBLIC MEETINGS: November 10, 2011, 6 p.m, Silverado Park Community Center, 1545 W. 31st St. in Long Beach, and November 16, 2011, 6 p.m., Wilmington Senior Center, 1371 Eubank St. in Wilmington

COMMENTS: The public comment/review period originally was scheduled from September 23 to December 22, 2011. The public comment/review period has been extended to February 1, 2012. Written comments on the Draft EIR should be sent to the following address:

Chris Cannon, Director of Environmental Management
Port of Los Angeles
425 South Palos Verdes Street
San Pedro, CA 90731

Comments can also be sent via e-mail to: ceqacomments@portla.org. Comments sent via email should include the project title in the e-mail’s subject line and a valid mailing address within the email.

For additional information, please contact the Port of Los Angeles Environmental Management Division at (310) 732-3675.

SCIG Draft Environmental Impact Report (DEIR)

Cover Page

 

Table of Contents

 

Executive Summary

 
Chapters

Chapter 1: Introduction

Chapter 3.10: Transportation/Circulation

Chapter 2: Project Description

Chapter 3.11: Public Services and Utilities

Chapter 3.0: Environmental Analysis

Chapter 3.12: Water Resources

Chapter 3.1: Aesthetics/Visual Resources

Chapter 4: Cumulative Analysis

Chapter 3.2: Air Quality and Meteorology

Chapter 5: Alternatives

Chapter 3.3: Biological Resources

Chapter 6: Environmental Justice

Chapter 3.4: Cultural Resources

Chapter 7: Socioeconomics and Environmental Quality

Chapter 3.5: Geology and Soils

Chapter 8: Growth-Inducing Impacts

Chapter 3.6: Greenhouse Gas Emissions and Climate Change

Chapter 9: Significant Irreversible Changes

Chapter 3.7: Hazards and Hazardous Materials

Chapter 10: References

Chapter 3.8: Land Use

Chapter 11: List of Preparers and Contributors

Chapter 3.9: Noise

Chapter 12: Acronyms

Appendices

Appendix A: Notice of Intent/Notice of Preparation/Initial Study

Appendix E: SCIG Environmental
Site Assessments

Appendix B: Aesthetics Visual Resource Methodology

Appendix F1: SCIG Noise Technical Study

Appendix C1 (Air Quality Appendices): Criteria Pollutant and GHG Emission Calculations

Appendix F2: Combined Analysis of SCIG and ICTF Facilities – Supporting Noise Data

Appendix C2 (Air Quality Appendices): Dispersion Modeling of Criteria Pollutants for the Southern California International Gateway Project

Appendix G1: SCIG Transportation Appendix

Appendix C3 (Air Quality Appendices): Health Risk Assessment for the Southern California Intermodal Gateway (SCIG)

Appendix G2: SCIG Rail Simulation Modeling Study

Appendix D: SCIG Cultural and Paleontological Reports

Appendix G3: Traffic Grade Crossing Delay Methodology